
Copernical Team
Euclid's large halo around indefinitely small point

Rocket Lab to boost Synspective's satellite constellation with more launches

CASIC plans new satellite network by 2030

Uniting Europe: DLR Spearheads Responsive Satellite Deployment Network

Webb Telescope catches glimpse of possible first-ever 'dark stars'

China's methane-fueled rocket achieves global first with successful orbital insertion

Rocket Lab readies launch of seven satellites from New Zealand

Japan rocket engine explodes during test: official

Astronauts' new rides for Artemis missions arrive at Kennedy Space Center

While the next humans to fly to the moon will rely on the Orion spacecraft for the nearly half-million-mile trip next year on the Artemis II mission, the final 9 miles to the launch pad will come while riding in one of three new astronaut transports now parked at Kennedy Space Center.
Three curvy electric vehicles officially referred to as CTVs, as in crew transportation vehicles, were built by California-based Canoo Technologies and arrived to KSC on Tuesday. They will be used during training leading up to the Artemis II flight slated for no earlier than November 2024.
That mission will fly the crew of three NASA astronauts and one Canadian Space Agency astronaut on a 10-day mission around the moon, the first time humans will fly in the Orion capsule launching atop the powerful Space Launch System rocket. It will pave the way for Artemis III no earlier than 2025 that seeks to return humans including the first woman to the lunar surface for the first time since 1972.
The new zero-emission CTVs are equipped to bring the four crew suited up in their spacesuits along with support personnel including a spacesuit technician on the ride from the Neil A.
Virgin Galactic plans its next commercial flight to the edge of space for August
