...the who's who,
and the what's what 
of the space industry

Space Careers

news Space News

Search News Archive

Title

Article text

Keyword

  • Home
  • News
  • Moon rocket launch looms as NASA evaluates hurricane damage

Moon rocket launch looms as NASA evaluates hurricane damage

Written by  Monday, 14 November 2022 16:39
Write a comment
Moon rocket launch looms as NASA evaluates hurricane damage
NASA's new moon rocket sits on Launch Pad 39-B Monday, Nov. 14, 2022, in Cape Canaveral, Fla. NASA's 21st-century moon-exploration program, named Artemis after Apollo's mythological twin sister. NASA is targeting an early Wednesday morning launch attempt. Credit: AP Photo/John Raoux

NASA started the countdown Monday for this week's planned liftoff of its new moon rocket, although hurricane damage could cause yet another delay for the test flight.

Hurricane Nicole's high winds caused a 10-foot (3-meter) section of caulking to peel away near the crew capsule at the top of the rocket last Thursday. Mission managers want to make sure the narrow strip won't damage the rocket if it breaks off during liftoff.

A final decision was expected Monday evening.

Liftoff is scheduled for the early morning hours of Wednesday from NASA's Kennedy Space Center, with test dummies rather than astronauts on board. It's the first test flight for the 322-foot (98-meter) rocket, the most powerful ever built by NASA, and will attempt to send the capsule into lunar orbit.

The nearly monthlong $4 billion mission has been grounded since August by fuel leaks and Hurricane Ian, which forced the rocket back into its hangar for shelter at the end of September. The rocket remained at the pad for Nicole; managers said there wasn't enough time to move it once it became clear the storm was going to be stronger than anticipated.

The space agency plans to send astronauts around the moon in 2024 and land a crew on the lunar surface in 2025.

Astronauts last visited the moon in December 1972, closing out the Apollo program.

A microwave oven-size NASA satellite, meanwhile, arrived Sunday in a special lunar orbit following a summer liftoff from New Zealand. This elongated orbit, stretching as much as tens of thousands of miles (kilometers), is where the space agency plans to build a depot for lunar crews. The way station, known as Gateway, will serve astronauts going to and from the lunar surface.

Moon rocket launch looms as NASA evaluates hurricane damage
NASA's new moon rocket sits on Launch Pad 39-B Monday, Nov. 14, 2022, at Kennedy Space Center in Cape Canaveral, Fla. NASA's 21st-century moon-exploration program, named Artemis after Apollo's mythological twin sister. NASA is targeting an early Wednesday morning launch attempt. Credit: AP Photo/John Raoux

The satellite, called Capstone, will spend six months testing a navigation system in this orbit.

© 2022 The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed without permission.

Citation: Moon rocket launch looms as NASA evaluates hurricane damage (2022, November 14) retrieved 14 November 2022 from https://phys.org/news/2022-11-moon-rocket-looms-nasa-hurricane.html
This document is subject to copyright. Apart from any fair dealing for the purpose of private study or research, no part may be reproduced without the written permission. The content is provided for information purposes only.

Read more from original source...

You must login to post a comment.
Loading comment... The comment will be refreshed after 00:00.

Be the first to comment.

Interested in Space?

Hit the buttons below to follow us...